Redditch Tunnel

Aerial View of Redditch Tunnel

Map of Redditch Tunnel

About Redditch Tunnel

Redditch Tunnel took 18 months to construct from 1866 to 1868 opening on the 4th May. The total length of the tunnel was 352 yards.

I will provide more information about the history of the tunnel at my presentations. I have included some photos inside the tunnel when the track was lifted. Also two photos showing the north and south portals.

For more information about my presentations, please click here.

You are viewing the text version of this site.

To view the full version please install the Adobe Flash Player and ensure your web browser has JavaScript enabled.

Need help? check the requirements page.


Get Flash Player